09/05/2025
Energy EN2

Avermieden Substation
Avermieden Substation | 2025 | Energy
For the new 220/33KV GDS substation Avermieden, Eurostrut supplied the ladder tracks for a reliable and well-organized cable infrastructure.
In collaboration with Mijnheer & De Groot Projectmontage successfully installed the cable support systems in this important switching point, where the energy from the Eekerweide and Evenreiten solar parks enters the electricity grid.
This Closed Distribution System (GDS) contributes to reducing grid congestion - a step in the right direction for the energy transition. Proud to be able to contribute to this!